top of page

Turn your smartphone into a high-precision, all-purpose surveying tool.

LRTK Phone

CLAS Compatible

Phone新筐体_v6.6 v5_背景透明.png

Achieve Coverage Even Outside Network Areas
by Simply Changing the Antenna

Image (1)-2_edited.jpg

Standard LRTK Antenna

This antenna supports network-based RTK only.
Compact and optimized for portability.

Supports CLAS, enabling use even in areas without cellular coverage. Also compatible with network-based RTK.

Off-Grid Compatible LRTK Antenna

Various Features

Useful functions to support civil engineering and inspection tasks.

Easily calculate earthwork volume using 3D point cloud data.
Simply scan the embankment to quickly obtain calculation results.

Acquire high-accuracy point clouds with precise positioning data.
You can quickly measure distances between two points and calculate volumes directly on-site.

Capture photos of outdoor structures and assets on-site, complete with centimeter-level accurate positioning data. Photos and their location information can be easily viewed in the cloud.

Guide workers precisely to specified locations at centimeter-level accuracy.
Eliminate situations such as "regular inspection points can't be located on-site."

Simple, One-Handed Positioning

Easily perform positioning by attaching the LRTK Phone to your smartphone.
Battery and antenna—all in the palm of your hand.

LRTK Phone 筐体

Fixed-Point Positioning with the Starter Kit

You can perform fixed-point positioning by attaching the LRTK Phone to a tripod.
Positioning accuracy is centimeter-level.

DSC02374.JPG

All You Need is Your Smartphone

The device includes a built-in battery and antenna.
Simply prepare position correction data, install the dedicated app,

and you’re ready to start positioning immediately.

Logo App Store2 s_RQIFILllwgexud.webp

​LRTK Pro2 Details

image.png
bottom of page